Products
Contact Us
- Contact Person : Ms. WU Catherine
- Company Name : Careddi Technology Co., Ltd.
- Tel : 86-25-58712360
- Fax : 86-25-58712370
- Address : Jiangsu,NANJING,Room 711, ZhongTai International Building, No.315, Middle JiangDong Rd, Nanjing City, China
- Country/Region : China
Product Detailed
Related Categories:Rubber Processing Machinery
Related Product Searches:20Ton/Day continuous scrap tires pyrolysis equipment,High Quality scrap tires pyrolysis equipment,scrap tires pyrolysis equipment CP-8
1: No explosion;
2: continuous production;
3: 3-5years liftspan
4: 45%-50% tire oil output
Related Product Searches:20Ton/Day continuous scrap tires pyrolysis equipment,High Quality scrap tires pyrolysis equipment,scrap tires pyrolysis equipment CP-8
Sn. | Item | Specification | |||
1 | Model | CP-5(batch) | CP-6(batch) | CP-8(batch) | CP-24(semi-continuous) |
2 | Raw material | Scrap rubber/PP plastic | Scrap rubber/PP plastic | Scrap rubber/PP plastic | Scrap rubber/Plastic |
3 | Structural form | Horizontal rotation | Horizontal rotation | Horizontal rotation | Horizontal rotation |
4 | Capacity per day | 5 ton | 6 ton | 8 ton -10tons | 24 ton |
5 | Oil yield per day | 2.25 tons fuel oil from tyre/2tons from plastic | 2.7 tons fuel oil from tyres/2.4tons from plastic | 3.6 tons fuel oil from tyres/3.2 tons from plastic(minium) | 10.8tons fuel oil from tyres/9.6tons from plastic |
6 | Operating pressure | Constant pressure | Constant pressure | Constant pressure | Constant pressure |
7 | Total Power(kw/h) | 20.4 | 26.4 | 29.7 | 138.2 |
8 | Mode of cooling | Water cooling | Water cooling | Water cooling | Water cooling |
9 | Cooling water water(Ton/Hour) | 2.5 | 6 | 6 | 12 |
10 | Heating mode | hot air | hot air | hot air | hot air |
11 | Working form | Intermittent operation | Intermittent operation | Intermittent operation | Semi-Continuous operation |
12 | Size of the main Reactor (mm) | 5100×2200x12 | 6000×2200x12 | 6000×2800x16 | 6000×2800x16 |
13 | Size of whole system (m) | 25*12 | 26*13 | 30*10 | 40*20 |
14 | Weight of whole system (Ton) | 35 | 43 | 60 | 70 |
15 | Delivery Time | 25 working days | 25 working days | 30 working days | 45 working days at least |